Rail Cling RC-100

D Lobby Escalator

On Hold

SUGGESTED MATERIAL
3M Cling

SUGGESTED CONSTRUCTION
Low Tack

AVAILABLE SURFACES
Single or Double Sided

ESTIMATED INSTALLATION LABOR
2 men 2 hrs

ESTIMATED DISMANTLE LABOR
2 men 1 hr

NOTES

22 panels located on street side of the escalator.
21 panels located on the hall side of escalator

8 Panels located on hall side of escalator

Buttons on corner of clings

  • Rail Cling RC-100
DIMENSIONS
Dimension not to scale.
Every effort has been made to ensure the accuracy of all information contained on this photo. However, no warranties, either expressed or implied, are made with respect to this photo. If the location of building columns, utilities or other architectural components of the facility is a consideration in the construction or usage of a graphic element it is the sole responsibility of the client to physically inspect the facility to verify all dimensions and locations.