Notifications Clear all
Your Cart (0)
Review Your Cart
Cart Total:
Total:
Hero Image
Available

Esc #8 - Lobby C (front left)

Lobby C 2nd Floor (front left)


CENTER STEEL - PLACEMENT & PRODUCTION
USD $ 2,300.00


SIDE GLASS - PLACEMENT & PRODUCTION
USD $ 3,700.00


AREAS / SECTION

West Level 2 : Section 4

Browse Similar Opportunities

 
Esc #5 - Lobby A4

USD $ 2,300.00 – 3,700.00

 
Esc #6 - Lobby B1

USD $ 2,300.00 – 3,700.00

Disclaimer

Every effort has been made to ensure the accuracy of all information contained on this photo. However, no warranties, either expressed or implied, are made with respect to this photo. If the location of building columns, utilities or other architectural components of the facility is a consideration in the construction or usage of a graphic element it is the sole responsibility of the client to physically inspect the facility to verify all dimensions and locations. It is the responsibility of the client to get written permission from the Center for any public concourse space to be utilized for sponsorships or advertising.

Orange County Convention Center