Window Cling L1-WC109

East Lobby / Near Admin Offices

Available

SUGGESTED MATERIAL
Tru-Cling/Clear Cling

SUGGESTED CONSTRUCTION
Print sections 1, 2 & 3 as one piece per section.

AVAILABLE SURFACES
Single Sided

ESTIMATED INSTALLATION LABOR
3 men 2 hours

ESTIMATED DISMANTLE LABOR
3 men 2 hours

NOTES
Please see the attached for more specifics on dimensions.

FRAME BETWEEN SECTIONS 1,2&3 IS 2.5"WIDE

EQUIPMENT:? 2- 19’ SCISSOR LIFT?  3- 6’ LADDER

TOOLS:? SQUEEGEE, ?DISH SOAP, ?SPRAY BOTTLE, WATER?, PAPER TOWELS?, WINDEX

 

DOWNLOAD FILE

  • Window Cling L1-WC109

Window Clings Opportunities

Every effort has been made to ensure the accuracy of all information contained on this photo. However, no warranties, either expressed or implied, are made with respect to this photo. If the location of building columns, utilities or other architectural components of the facility is a consideration in the construction or usage of a graphic element it is the sole responsibility of the client to physically inspect the facility to verify all dimensions and locations.