Escalator Runner L1-ER101

Main Lobby

Available

SUGGESTED MATERIAL
PAPER GRAPHIC WITH 3M CONTROL TAC ADHESIVE ENDS

SUGGESTED CONSTRUCTION
PRINT ONE SOLID GRAPHIC PER RUNNER / ?APPLY 24" OF CONTROL TAC TO EACH END OF RUNNER

AVAILABLE SURFACES
Single Sided

ESTIMATED INSTALLATION LABOR
2 Men / 2 Hours

ESTIMATED DISMANTLE LABOR
2 Men / 2 Hours

NOTES

Please see download files below for additional construction and installation details.

DOWNLOAD FILES

  • Escalator Runner L1-ER101

Escalator Graphics Opportunities

Every effort has been made to ensure the accuracy of all information contained on this photo. However, no warranties, either expressed or implied, are made with respect to this photo. If the location of building columns, utilities or other architectural components of the facility is a consideration in the construction or usage of a graphic element it is the sole responsibility of the client to physically inspect the facility to verify all dimensions and locations.