Escalator Graphics L1-EG103

West Registration / Up to Meeting Room Level

Available

SUGGESTED MATERIAL
3M Control Tac

SUGGESTED CONSTRUCTION
Print graphic in two pieces split vertically. Adjust for registration.

SUGGESTED SIZE
20’W x 32"H

AVAILABLE SURFACES
Single Sided

ESTIMATED INSTALLATION LABOR
2 men 1 hour

ESTIMATED DISMANTLE LABOR
2 men 1 hour

NOTES

EQUIPMENT: ?SCISSOR LIFT

TOOLS:? SQUEEGEE, ?DISH SOAP?, SPRAY BOTTLE, WATER, ?PAPER TOWELS, ?WINDEX

DIRECTIONS:? BEFORE APPLICATION,?USE THE WINDEX TO REMOVE ANY OILY RESIDUE ON METAL. THIS WILL INSURE ADHERENCE.?MIX COLD WATER AND EIGHT DROPS OF DISH SOAP IN A SPRAY BOTTLE AND SHAKE SOLUTION WELL. NEXT, SPRAY METAL AND GRAPHIC WITH A LIBERAL AMOUNT OF SOLUTION BEFORE APPLYING GRAPHIC TO THE METAL. LINE UP AND LEVEL OUT GRAPHIC ON METAL. USE SQUEEGEE TO REMOVE SOLUTION FROM IN BETWEEN GRAPHIC AND METAL. WIPE THE GRAPHIC CLEAN OF SOLUTION RESIDUE BEFORE MOVING TO NEXT JOB.

  • Escalator Graphics L1-EG103
DIMENSIONS
Dimension not to scale.

Escalator Graphics Opportunities

Every effort has been made to ensure the accuracy of all information contained on this photo. However, no warranties, either expressed or implied, are made with respect to this photo. If the location of building columns, utilities or other architectural components of the facility is a consideration in the construction or usage of a graphic element it is the sole responsibility of the client to physically inspect the facility to verify all dimensions and locations.